United Boulevard Industrial Complex
Client: WesGroup Construction
Location: Abbotsford
Start Date: July 2021
This project consisted of site preparation, excavation and civil work for WesGroup’s first in Western Canada 215,000 multi-level industrial building. This is an exciting project and amazing to whiteness the engineering genius which makes it possible to drive full size semi trucks onto a second level of industrial space! There were over 628 750mm piles which Asara used there state of the art pile cropper to cut to proper depth and then processed the waste concrete onsite with there bucket crushers. There was good value turning all the waste concrete into 3” minus Aggregates. All excavating was done with precision using Asara’s gps machine control.