Client:
                            
                            Red Earth Contracting
                        
                    
                    
                        
                            
                                Location:
                            
                            Abbotsford
                        
                    
                    
                        
                            
                                Start Date:
                            
                            July 2021
                        
                    
                 
                
                    This project involved the clean up and stabilization of a 50 meter embankment which dropped to neighboring property below. It was a challenge as conditions were wet and unstable. One wrong move could cost substantial damage to equipment and crew. A strict safety plan was implemented to ensure all members involved would have zero incidents. The project went very well and the home above was saved before sliding down the embankment.